Riverside Terrace, Cardiff
- Sector: Sports & Leisure
- Project Type: Cat B Fit Out
About this Project
The Riverside Terrace project involved the rapid supply and fit of modern electrical installations within a newly designed hospitality space in Cardiff. The fit-out was delivered on a fast-track programme to meet strict deadlines ahead of a major sporting event season. The aim was to create a high-quality, welcoming environment with advanced lighting and power solutions tailored for both functionality and aesthetic appeal. Attention to detail, efficiency in delivery, and seamless integration with the interior design were critical elements in the successful completion of this project. Evans Electrical worked closely with architects, designers, and the client to ensure the facility reflected a premium hospitality experience, while maintaining the robustness and reliability required for high-footfall usage.
Evans Activities Comprised
– Contingency: Ensuring flexible electrical provisions were available to accommodate late design changes and client requests without delaying the programme.
– Emergency Lighting: Installation of a fully compliant emergency lighting system designed to ensure safe evacuation routes and meet regulatory standards.
– Testing & Commissioning: Comprehensive testing of all installed electrical systems to certify safety, compliance, and operational efficiency before handover.
– General Lighting: Supply and installation of high-quality LED lighting systems, balancing energy efficiency with premium aesthetics to enhance the hospitality environment.
– Feature Lighting: Bespoke lighting solutions to highlight architectural features and create a unique ambiance within the hospitality space.
– Data Installation: Provision of structured cabling to support Wi-Fi and IT infrastructure, ensuring guests and staff benefit from seamless connectivity.
– Small Power: Installation of power outlets and provisions for catering, multimedia equipment, and staff operational areas.
– Isolation & Removal of Existing Installation: Safe disconnection and removal of redundant electrical services to prepare the site for new installations.
Related Projects
HMRC Offices, Cardiff
Dept of Work & Pensions
Principality Stadium
Contact Us
Address
59 Waterloo Road, Cardiff, CF23 9BL
Aztec West 2530, Ground Floor, Bristol, BS32 4TS
Tel
02920 493307
01173 790960


