Sigma 3 Kitchens, Manufacturing Facility, Bridgend
- Sector: Industrial, Manufacturing & Logistics
- Project Type: Electrical Services
About this Project
Evans Electrical was appointed by Sigma 3 Kitchens, the UK’s highest-rated kitchen renovation service provider, to deliver the full electrical installation for their brand-new 130,000 sq. ft. manufacturing facility in Bridgend. The facility was designed to support the company’s rapid growth, increasing both production capacity and office accommodation. This fast-track 8-month project included the design, installation, testing, and commissioning of state-of-the-art electrical systems to create a modern, efficient, and sustainable manufacturing hub. Works included
low-voltage distribution, lighting, EV charging, structured cabling, and advanced fire and security systems. By integrating innovative, energy-efficient technology, the facility is future-proofed to meet long-term operational and environmental goals.
Evans Activities Comprised:
- Low Voltage Distribution: Full installation of switchgear, sub-main cabling, and containment.
- Lighting Systems: General, emergency, intelligent lighting controls, and external floodlighting.
- EV Charging Infrastructure: Supply and installation of 22kW twin chargers.
- Life Safety Systems: Fire alarm installation, disabled refuge system, and lightning protection.
- Security & Communications: CCTV system, Access control & intercom, Intruder alarm system, Public address system.
- Structured Cabling: Data and communications infrastructure.
- Mechanical & Specialist Connections: Electrical connections for plant and fixed specialist equipment.
- Electric Heating Installation.
- Earthing & Bonding: Including surge protection.
- Testing & Commissioning: Ensuring compliance and operational readiness.
- Ongoing Maintenance Services: Comprehensive aftercare and support.
Key Outcomes:
- Future-Proof Manufacturing Facility: Delivered a scalable, modern electrical infrastructure to support long-term growth.
- Sustainable Technology: Energy-efficient LED lighting and EV charging points reduce running costs and environmental impact.
- Enhanced Safety & Security: Integrated fire detection, access control, and CCTV for maximum site safety.
- On-Time Delivery: Successfully completed within the 8-month programme with no compromise on quality.
Other Projects
HMRC Offices, Cardiff
Dept of Work & Pensions
Principality Stadium
Contact Us
Address
59 Waterloo Road, Cardiff, CF23 9BL
Aztec West 2530, Ground Floor, Bristol, BS32 4TS
Tel
02920 493307
01173 790960